Leap Year Sewer Project, Breckenridge CO

Project Details Client Stan Miller Time Line 16 Days Equipment Used JT100 Ditch Witch Directional Drill Distance 900’ Location Breckenridge, CO Issue and Solution Client Issue: Client needed a sewer line for new construction in mountain area. Americom Solution: We used our large JT100 directional drill to bore in at [...]

Read More

Huntsman Cancer Research Center, Salt Lake City UT

Project Details Client Medical Industry Time Line November 2017 Location Salt Lake City, UT Scope of Work Installed the low voltage communication system within the entire Huntsman Cancer Facility, consisting of Huntsman Cancer Institute, Huntsman Cancer Hospital, and Huntsman Cancer Research Center. Systimax CAT6 UTP and CAT6A cabling solution. HCH [...]

Read More

IHP 4 and 8 Inch Gas, and 12 Inch Casing, Park City UT

Project Details Client Flare Construction Inc. Time Line Sept. 2017 – Oct. 2017 Equipment Used DitchWitch JT100 Distance 1400 feet Location Park City, UT Issue and Solution Client Issue: Client needed to replace existing gas line next to busy highway and under hiking trails. Americom Solution: Americom performed the project [...]

Read More

Snowbird Fiber Optic Cable Upgrade

Project Details Client Telecom Industry Time Line August 2017 – Oct. 2017 Equipment Used Rock Saw, 308 Excavator, Hydro Excavator Location Little Cottonwood Canyon, UT Issue and Solution Client Issue: Client needed to run fiber across rough canyon terrain. Aerial was only a partial option. Americom Solution: Rock trench and [...]

Read More
Americom helping a client solve their microtrenching needs.

Escalante Fiber Optic – Microtrench

Project Details Client South Central Communications Time Line May 2017 – June 2017 20 Days Equipment Used DitchWitch MT16 Distance 6 Miles Location State Route 12 Escalante, UT Issue and Solution Client Issue: Client needed to run fiber across rough canyon terrain. Aerial was not an option. Americom Solution: Microtrench [...]